Personal Pic Sean Kim Broker pic skim@remax.net Re/Max Realty One Inc., Brokerage Independently owned and operated. pic 50 Burnhamthorpe Rd. West Suite 102, Mississauga, Ontario L5B 3C2 pic Office: 905-277-0771 | Fax: 905-277-0086


Google MapAmenities
Pre-construction Under-construction Completed

Total Count of Projects: 393
1234567891011121314151617181920Next >

Address: 1001 Sheppard Ave. East, North York, ON M2K 1C2

Approximately occupancy date:Summer 2022

Building size: 36 Storeys

Builder: Concord Adex

Project Description:

King's Landing is a new condo development by Concord Adex. King's Landing is nearby Ambrose Parkette and Bessarion, the project is estimated to be completed by 2022 and will be located on Concord Park Place Community at Esther Shiner Boulevard near the Bayview Village neighborhood in North York.

 

Address: 1285 Queen St E Toronto, ON M4L 1C2

Approximately occupancy date:

Building size: 6 Storeys

Builder: Fieldgate Urban

Project Description:

The Poet Condos is a new condo development by Fieldgate Urban currently in preconstruction at 1285 Queen Street East, Toronto. The Poet Condos has a total of 69 units.

 

Address: 533 King St W Toronto, ON M5V 1K4

Approximately occupancy date:

Building size: 16 Storeys

Builder: By Westbank and Allied Properties

Project Description:

King Toronto is a new condo development by Westbank and Allied Properties currently in preconstruction at 533 King Street West, Toronto. King Toronto has a total of 514 units.

 

Address: 3220 Sheppard Ave Escarborough, ON M1T 3K1

Approximately occupancy date:October 2020

Building size: 18 Storeys

Builder: Quadcam Development Group Incorporated

Project Description:

East 3220 Condos is a new condo development by Quadcam Development Group Incorporated currently in preconstruction at 3220 Sheppard Avenue East, Toronto. The development is scheduled for completion in 2020.

 

Address: 28 Widmer StToronto, ON M5V 2E7

Approximately occupancy date:January 2022

Building size: 48 Storeys

Builder: Plaza

Project Description:

Encore Theatre District Condos is a new condo development by Plaza currently in preconstruction at 28 Widmer Street, Toronto. The development is scheduled for completion in 2022.

 

Address: 2900 Hwy 7, Vaughan, ON L4K 0G3

Approximately occupancy date:

Building size: 60 Storeys

Builder: Cortel Group

Project Description:

CG Tower Condos is a new condo development by Cortel Group currently in preconstruction at Vaughan. CG Tower Condos has a total of 507 units.

 

Address: 139 Church St Toronto, ON M5B 1Y4

Approximately occupancy date:

Building size: 49 Storeys

Builder: Pemberton Group

Project Description:

139 Church Street Condos is a new condo development by Pemberton Group currently in preconstruction at 139 Church Street, Toronto. 139 Church Street Condos has a total of 414 units.

 

Address: 2781 Yonge St Toronto, ON M4N 2H8

Approximately occupancy date:

Building size: 9 Storeys

Builder: Devron Developments

Project Description:

The Winslow is a new condo development by Devron currently in preconstruction at 2781 Yonge Street, Toronto. The Winslow has a total of 68 units.

 

Address: 55 Charles St E Toronto, ON M4Y 1S9

Approximately occupancy date:

Building size: 55 Storeys

Builder: MOD Developments Inc.

Project Description:

55 Charles Street Condos is a new condo development by MOD Developments Inc. currently in preconstruction at 55 Charles Street East, Toronto. 55 Charles Street Condos has a total of 648 units.

 

Address: 406 Keele St Toronto, ON M6P 4H4

Approximately occupancy date:

Building size: 4 Storeys

Builder: Block Developments

Project Description:

The Stockton Condos is a new condo development by Block Developments currently in preconstruction at 406 Keele Street, Toronto. The Stockton Condos has a total of 30 units.

 

Address: 540 King St W Toronto, ON M5V 1M3

Approximately occupancy date:

Building size: 12 Storeys

Builder: Great Gulf Homes

Project Description:

540 King West Condos is a new pre-construction residential development project located at 540 King Street West In downtown Toronto. Development by Great Gulf. The project Feature with a 12-storey condo tower and Total 77 Units.

 

Address: 293 The Kingsway Toronto, ON M9A 3A9

Approximately occupancy date:

Building size: 8 Storeys

Builder: Malen Capital and Benvenuto Group

Project Description:

A jewel of a residential community, with treelined avenues and lush parks, The Kingsway is a world apart. Sip a coffee with a friend at a nearby café, bike along the riverside, shop for freshly baked bread at a local artisan bakery or pick up fresh fruit on your way home. This is a sought-after neighborhood designed for those who like to live well.

 

Address: 2 Gibbs Rd, Etobicoke, ON M9B 6L6

Approximately occupancy date:2020

Building size: 10 Storeys

Builder: Edilcan Development Corporation

Project Description:

Park Terraces at Valhalla Town Square is a new condo development by Edilcan Development Corporation currently in preconstruction at 2 Gibbs Road, Toronto. The development is scheduled for completion in 2020. Park Terraces at Valhalla Town Square has a total of 387 units, sizes range from 469 to 1087 square feet.

 

Address: 05 Richmond St W Toronto, ON M5V 3N4

Approximately occupancy date:January 2020

Building size: 13 Storeys

Builder: MOD Developments Inc. and Woodcliffe Landmark Properties

Project Description:

WaterWorks Toronto is a new condo development by MOD Developments Inc. and Woodcliffe Landmark Properties currently in preconstruction at 505 Richmond Street West, Toronto. The development is scheduled for completion in 2020. WaterWorks Toronto has a total of 299 units, sizes range from 1150 to 1150 square feet.

 

Address: 70 Old Mill Rd, Oakville, ON L6J 7W3

Approximately occupancy date:Fall/Winter 2019

Building size: 10 Storeys

Builder: Opus Signature Collection

Project Description:

Welcome to The Insignia Private Residences at Sixteen Mile Creek. Every aspect of this new Oakville private residence has been designed to reflect its owners’ taste, sophistication and unique sense of style. Whether you customize your residence to the last detail or choose from one of our thoughtful and inspired designs, living at The Insignia is living without compromise.

 

Address: Stanley Greene Boulevard North York, ON

Approximately occupancy date:August 2021

Building size: 10 Storeys

Builder: Mattamy Homes

Project Description:

Saturday in Downsview Park Condos will bring three new Graziani + Corazza Architects-designed buildings to the southwest edge of the vast park, with frontages along Keele Street to the west, Downsview Park Boulevard to the north, and George Butchart Drive to the east.

 

Address: 2720 Dundas St W Toronto, ON M6P 1Y2

Approximately occupancy date:

Building size: 9 Storeys

Builder: Slate Asset Management and Globizen Developments

Project Description:

A beautifully designed midrise building in Toronto’s vibrant Junction neighbourhood. Junction House will present a range of living options, including spacious 1, 2 and 3 bedroom lofts, 2 storey skytowns and a limited collection of townhomes. All housed in a striking modern building designed by Toronto’s superkul architects.

 

Address: 444 Front St W Toronto, ON M5V 2S9

Approximately occupancy date:2023

Building size:

Builder: Tridel Corporation and Allied Properties and RioCan Living and Diamondcorp

Project Description:

THE WELL is creating over a million square feet of residential space that offers Torontonians a rich experience of life in our city. There will be homes to accommodate everyone’s lifestyle from single to retired to growing families.

 

Address: 10 Eva Rd, Etobicoke, ON M9C 1E8

Approximately occupancy date:2018

Building size: 28 Storeys

Builder: Tridel Corporation

Project Description:

Home is more than bricks and mortar. It is a gathering place for family and friends. A place to celebrate milestones. A place where memories are made. A sanctuary of comfort. It is a reflection of who we are. Evermore is the third phase at West Village in Etobicoke. A thoughtfully designed space that inspires us to live more.

 

Address: 831 Glencairn Ave Toronto, ON M6B 3J4

Approximately occupancy date:

Building size: 10 Storeys

Builder: Chestnut Hill Developments

Project Description:

831 Glencairn Condos is a new per-construction Condo project located at 831 Glencairn Ave In Midtown Toronto. The Major intersections are Lawrence Avenue West s and Ddufferin street. The Project Including condos units, Retail Shops. 831 Glencairn Condos Develop by Chestnut Hill Developments. The Project has a total of 10 stories and 224 Units

 

1234567891011121314151617181920Next >
ALL
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
Become A Member
First Name:
Last Name:
Email:
Phone:
Short Message:
Subscribe me:
Security Code:
Mortgage Rate
Canadian Mortgages
Office: 905-277-0771       Mobile: 416-998-1113      Fax: 905-277-0086